12.6 C
Byron Shire
June 26, 2026

Richmond River High campus designs on display

Latest News

Planets and weather align for Cape Byron Steiner Winter Solstice success

Last Thursday, in the days before the Winter Solstice, and after weeks of on and off rain that had more than a few parents nervously eyeing weather apps, Cape Byron Steiner School's annual Winter Festival went ahead.

Other News

Lismore students pitch sustainability projects

Young people will take centre stage in Lismore this Friday when the HalveIt Festival brings student sustainability pitches to decision-makers in what organisers are calling 'part innovation expo, part community festival.'

A Byron kickback with the Gimelli family

The Gimelli family ran a small Italian restaurant on Jonson Street from about 1995 into the early 2000s. It was a classy joint, ahead of Byron’s culinary curve, serving dishes from every corner of Italy.

NT Intervention

I refer to the NT Intervention article, Echo page 4, 17 June. Recent events in the Northern Territory (NT) would...

BSC moves closer to special rate rise

Byron Shire Council has moved a step closer to seeking a special rate rise, unanimously endorsing a community engagement program that will form a key part of any future application to increase rates above the state-imposed cap.

Six dwellings proposed on flood-prone Mullum block

Six units are proposed at the eastern end of New City Road, Mullumbimby, on a site that was inundated during the 2022 floods. Submitted by Duncan Band's Kollective, Development Application (DA) 10.2026.269.1 at 73 New City Road is on public exhibition with Byron Shire Council, and sits within the Shire's flood planning area.

Booyong Abattoir I

We strongly believe that the disturbing Booyong Abattoir is a blight on Byron Shire. The health and wellbeing of the local...

Richmond River High design overview PIC supplied

Designs for the rebuild of Lismore’s Richmond River High campus are available for the public to see, four months after fire severely damaged the school’s main historic building.

The campus hasn’t been used for classes since the 2022 Northern Rivers flood and landslide disasters.

Police in early April said this year’s fire was suspected of being deliberately lit.

Richmond River High is one of 21 schools listed as suffering significant damage in the disasters more than three years ago, with the state government last week saying 16 have been repaired or rebuilt.

The public school is to be housed in what the government says will be a world-class campus at a new flood-resilient location in North Lismore.

‘Green and rural feel’ for North Lismore school campus

Proposed RRHC school campus satellite view (PIC SUPPLIED)

Richmond River High’s campus is to be part of The Rivers Secondary College campus, alongside Kadina High and Lismore High, with buildings to be on high ground overlooking existing sports fields and green spaces.

The government says buildings will be modular and built off-site while civil infrastructure works are carried out onsite, to expedite delivery.

Campus designs include 36 regular classrooms, three support classrooms, fourteen specialist learning spaces, including science labs and wood and metal workshops, a library, multipurpose hall, performance spaces, sport facilities, agriculture, construction and food technologies.

Planning approval is to be fast-tracked by an extra two months with the rebuild expected to be finished by early 2027.

Labor Member for Lismore Janelle Saffin, also the NSW Minister for Disaster Recovery, said as part of last week’s announcement the plans were based on extensive feedback from students, staff, parents, and members of the community.

‘It is so good to see Richmond River High being built back in North Lismore,’ Ms Saffin said, ‘this will be a flood-resilient campus for Lismore and surrounds, serving the local primary schools in the area’.

‘It will maintain a green and rural feel, preserving the character that the community told us during consultation has made Richmond River High important to young people in Lismore for so many years.’

Designs can be accessed via the NSW Planning Portal until 21 August.



For four decades The Echo has printed the stories some people loved, some people hated, and some pretended not to read. If you want us to keep telling the truth, the real truth, not the sugar-coated version. We’ll need your support to keep the presses rolling.

If you are a local business owner help us and in turn we help you. All The Echo asks for is advertising, not a free ride. It is every advert in The Echo and on www.echo.net.au, which creates the space for all the stories and coverage of community events, happenings and concerns.

If you are a reader you can become a sponsor of The Echo. Your support keeps the us independent.

Even a small one-off or regular donation from you will help keep the echo’s independent voice alive and strong.

Support Us

Become one of the supporters who helps keep independent, local journalism alive in the Byron Shire by contributing anything from as little as the cost of a coffee each month.

You're Wonderful, Thank you for supporting independent journalism in the Byron Shire

You’re supporting The Echo, thank you

Your contribution is keeping independent, local journalism alive in the Northern Rivers.

Because of supporters like you, we can keep every story free for everyone — no paywall, no exceptions. Your money goes directly to funding our newsroom of 40-odd local workers covering the stories that matter to this community.

Tell us what you think, give us your opinion

The Echo loves your letters and comments and is proud to provide a community forum on the issues that matter most to our readers and the people of the NSW north coast. So don’t be a passive reader, email us your epistles at editor@echo.net.au.

The letters deadline for The Echo is noon Friday. Letters longer than 200 words may be cut. The publication of letters is at the discretion of the letters editor. Please remember to include your full name, address and telephone number.

Online comments are no longer available.

Kyogle bridge build completed in under three months

Kyogle mayor Danielle Mulholland says a new bridge on Gradys Creek Road, off Summerland Way and north of Kyogle, has opened to traffic. She says it took Council less than three months to build Methvens Bridge.

57 Station St, Mullumbimby amended DA on public exhibition

The development application (DA 10.2025.212.1) for the carpark at 57 Station Street, Mullumbimby is now back on exhibition for eight weeks from 22 June.

A Byron kickback with the Gimelli family

The Gimelli family ran a small Italian restaurant on Jonson Street from about 1995 into the early 2000s. It was a classy joint, ahead of Byron’s culinary curve, serving dishes from every corner of Italy.

12 winners at Byron Bay Herb Nursery

The Byron Bay Herb Nursery continues to create constructive pathways to achievement with 12 students from Byron Bay Herb Nursery’s disability support program recently graduating with a Certificate II in Horticulture.