Northern Rivers Railway Restoration:
- Licensing Progress: Northern Rivers Rail Ltd (NRRL) and Northern Regional Railway Company (NRRC) are highly advanced in securing the regulatory licence. This will allow them to restore the 72 km rail corridor connecting Lismore to the Byron/Tweed Shire border.
- Service Expansion: Capital and grant funding is actively being sought to extend clean energy public transport, expanding on the current 3 km service established by the landmark Byron Solar Train.
- Infrastructure Feasibility: Technical assessments confirm that track restoration between Byron Bay and Mullumbimby requires less than $1 million per kilometre. An additional $3 million covers fleet expansion, battery upgrades, and regional fast-charging hubs, bringing the total cost to under $17 million.
Public Transport Demand & Economic Impact
- Regional Growth Pressures: One of the fastest-growing regions in New South Wales, we experience higher visitor numbers than any destination in NSW outside of Sydney, and traffic is increasing daily.
- Overwhelming Survey Backing: A recent independent survey showed 84% of surveyed residents support returning rail services, matching NRRL’s on-the-ground survey showing 85% in favour. Over 90% of local businesses also support restoration of regional rail. However, rail trail petition responses are disproportionately not local.
- Proven Coexistence Model: A combined ‘Rail and Trail’ blueprint yields superior financial returns. The $230,000 Arcadis Report (2019) commissioned by Byron Shire Council concluded that incorporating rail services alongside a walking/cycling path delivers the optimal economic result.
Governance & Environmental Assessment
- Environmental Report Misinterpreted: Byron Shire Council’s recent vote against supporting coexisting rail with trail cited ‘environmental risks.’ This was based on a misreading of the Planit Report, which explicitly identified only one single endangered plant specimen (a Fine-Leaf Tuckeroo) within the proposed pathway.
- Lack of Consultation: Neither Byron Shire nor Lismore City Councils have hosted formal community consultation forums. This has prevented residents from voting on a combined transport corridor versus an exclusive bike path.
- Ratepayer Risk Exposure: Council actions, advocating for one group, to remove existing tracks for a single-use trail, rely on unresolved funding. Rail trails create long-term maintenance costs for local ratepayers. There is no quantitative proof of improved general economic outcomes in local towns near rail trails.
- Corridor Safety Advantage: Operational light rail systems significantly improve the safety of shared corridors. Active train services function as a natural deterrent against hazards like brown snakes, common on isolated rail-trails like Tweed and Casino-Lismore.
Let the facts speak for themselves…
Lydia Kindred, NRRL Director/Secretary


For four decades The Echo has printed the stories some people loved, some people hated, and some pretended not to read. If you want us to keep telling the truth, the real truth, not the sugar-coated version. We’ll need your support to keep the presses rolling.