20.3 C
Byron Shire
October 20, 2026

Rous focus on Alstonville groundwater to boost region’s supply

Latest News

Cinema: NAZA

A must-see, award-winning documentary investigating AI warfare in Gaza. Fresh from winning the Special Jury Prize at the 2026 Venice International Film Festival, NAZA, the latest documentary from Academy Award-winning filmmakers Yuval Abraham and Rachel Szor (No Other Land), examines artificial intelligence and surveillance in Israel’s military operations in Gaza.

Other News

Address from national refugee leader

Anyone interested in helping settle refugees in our region is invited to hear an address on November 7 by Romy Vitalien, director of the national program for refugee sponsorship in Australia.

Coorabell Hall Spring Fever

Spring Fever Fashion Parade celebrates a stream of flower-powered, funky, upcycled, reloved and new fashion for gals, guys and some kidswear along with jewellery, hats and reloved accessories twirling on the Coorabell Hall runway on Friday, 16 October at 7pm. Music from DJ MLC and co MC Dr Baz.

Bruns residents and Reflections struggle to find common ground

Brunswick Heads residents called on their local MP Tamara Smith for a meeting to discuss the fences that Reflections Holiday Parks have erected around the park area where the community planted native cypress pines commemorating the Battle of Lone Pine in WWI, which has been utilised by the community for over 60 years for recreation.

Mayor Sharon Cadwallader announces bid for state seat of Ballina 

Ballina Mayor Sharon Cadwallader will contest the state seat of Ballina as an independent, arguing that local ratepayers are carrying costs that should be met by the NSW government.

New koala strategy leaves local priorities to later implementation plan

Northern Rivers residents are being invited to help shape a new NSW koala conservation strategy, with specific local actions and investment priorities to be detailed in a separate implementation plan.

Fish kill follows Belongil Creek opening as Council reviews protocols

A fish kill at Belongil Creek has prompted warnings to avoid the affected area, with Byron Shire Council and government agencies investigating the incident following an artificial opening of the creek.

Ballina Mayor and Rous County Council Deputy Chair Sharon Cadwallader. Photo David Lowe.

The Rous County Council has confirmed plans to tap into groundwater on the Alstonville plateau days after Ballina Mayor Sharon Cadwallader confirmed support of a ‘water security’ project there.

Future water plans from the Rous County Council online show Stage One of a Future Water Project 2060 [FWS] for the region includes ‘Alstonville Groundwater’ via an Alstonville Water Treatment Plant [WTP].

Councillor Cadwallader also confirmed plans for the WTP days earlier to The Echo, saying the Rous County Council was working with Ballina Shire Council staff on submitting a proposal for the project.

‘The proposal will be coming to our commercial services meeting regarding that site, in order to build,’ Cr Cadwallader said last week.

The mayor was light on detail concerning funds for the project, saying she thought it ‘might have got some money somewhere along the along the way’.

‘But I think we’ve loan funded it mainly,’ Cr Cadwallader said, ‘I’d have to check into that for you’.

Cr Cadwallader, also Rous County Council Deputy Chair, said it was ‘possible’ a water treatment plant would be proposed, ‘because Rous County Council have started pumping from the Clarence Morton basin, because we know we’re going to run out of water by 2024’.

The mayor said the project was needed ‘before we can move forward on this Future Water Strategy 2060 with all options being on the table’.

Her comments came after a recent ordinary Ballina Shire Council meeting that featured repeated reference to eight hectares of council-owned land next to the Russellton Industrial Estate at Alstonville.

Other councillors, including Greens Cr Simon Chate and Independent Cr Jeff Johnson, had suggested the land could be opened up for private light industrial activity instead of including a bigger nearby parcel of State Significant Farmland in an official list of Strategic Urban Growth Areas for the shire.

But Cr Cadwallader had mentioned the possibility of the council-owned already being considered for a ‘water security project’.

Rous says connecting bore built in Wollongbar in January

Rous has been declaring a bore’s construction in nearby Wollongbar ‘a significant milestone’ as far back as February.

A project update from Rous that month declared an ‘important milestone with construction of a new groundwater supply bore at Converys Lane in Wollongbar Stage commencing in January’.

Rous said it was the Future Water Project’s ‘first piece of new water supply infrastructure’.

The council said it was ‘undertaking a rigorous process to develop’ the
new deep bore and meet ‘the requirements of the NSW Government’s Natural Resources Access Regulator’.

An accompanying flow chart showed construction had started.

Government yet to ‘sign off’ on Alstonville drilling plan

Green belt between Russellton industrial area, looking towards Alstonville. Photo David Lowe.

Earlier this week, Rous County Council Future Water Planning Manager Michael McKenzie told the ABC he hoped the government would ‘sign off’ on the proposed water-tapping project for the Alstonville project within the next six months.

Rous was still wanting to do more work and more consultation with state authorities aimed at approval for water drilling, Mr McKenzie said.

Stage One of the FWS online was identified as running from 2021 to 2025, with the Alstonville water project was to be the main focus for the first four years of the FWS.

Details showed it included developing a new groundwater treatment plant in the Alstonville/Wollongbar area and installing ‘associated infrastructure to transfer raw groundwater to the new treatment plant and treated water to the bulk water network’.

‘This new plant is needed to treat groundwater sourced from the Clarence Moreton Basin (Alstonville) groundwater source so it can be used as part of the fulltime regional drinking supply,’ Rous said.

Farmers’ water untouched but climate risks unclear

Water identified for the proposed project was separate from groundwater already used by farmers on the Alstonville plateau, Rous said.

‘This new bore is not the Alstonville Basalt Plateau Groundwater Source,’ the council said.

The ‘deeper Clarence Moreton Basin Groundwater Source’ was described at ‘around 220 metres below the ground’.

‘Adding this new groundwater source in the short term is expected to help secure our regional water supply from 2024/25,’ Rous said.

Preliminary planning works and other investigations related to stage two of the FWS were also said to be getting underway in 2022.

Stage two featured groundwater from Tyagarah in the Byron Shire.

But while reassurances were given on impacts to farming and existing eco-systems, climate risks were less certain.

‘Groundwater is less susceptible to the effects of drought conditions than surface water systems, such as creeks and dams,’ Rous said, but added ‘groundwater is not considered to be a rainfall or climate independent source of water’.

Rous said it was using the same approach as that used for surface water options when assessing impacts of climate change on long-term reliability.

‘This approach is recommended given the uncertainty surrounding the effect of climate change on groundwater resources,’ Rous said.

Rous said Stage three was due to start in 2030 and would depend on the outcome of ‘extensive investigations into the potential use of purified recycled water, desalination and more groundwater schemes as additional sources beyond 2040’.

$30 million-plus for St Helena water main repairs

Cr Cadwallader said elsewhere in the region the Rous County Council had started work on repairs to one of the main water supply connections at St Helena.

She said councillors were alternating meetings with workshops and field trips and had recently been to see the project site, with the work budgetd at around $35 million.

Cr Cadwallader said the St Helena pipe was more than seventy years and repairs had been on the Rous to-do list for some time.

The next Rous County Council meeting was due to happen on 14 December.



For four decades The Echo has printed the stories some people loved, some people hated, and some pretended not to read. If you want us to keep telling the truth, the real truth, not the sugar-coated version. We’ll need your support to keep the presses rolling.

If you are a local business owner help us and in turn we help you. All The Echo asks for is advertising, not a free ride. It is every advert in The Echo and on www.echo.net.au, which creates the space for all the stories and coverage of community events, happenings and concerns.

If you are a reader you can become a sponsor of The Echo. Your support keeps the us independent.

Even a small one-off or regular donation from you will help keep the echo’s independent voice alive and strong.

Support Us

Become one of the supporters who helps keep independent, local journalism alive in the Byron Shire by contributing anything from as little as the cost of a coffee each month.

You're Wonderful, Thank you for supporting independent journalism in the Byron Shire

You’re supporting The Echo, thank you

Your contribution is keeping independent, local journalism alive in the Northern Rivers.

Because of supporters like you, we can keep every story free for everyone — no paywall, no exceptions. Your money goes directly to funding our newsroom of 40-odd local workers covering the stories that matter to this community.

Tell us what you think, give us your opinion

The Echo loves your letters and comments and is proud to provide a community forum on the issues that matter most to our readers and the people of the NSW north coast. So don’t be a passive reader, email us your epistles at editor@echo.net.au.

The letters deadline for The Echo is noon Friday. Letters longer than 200 words may be cut. The publication of letters is at the discretion of the letters editor. Please remember to include your full name, address and telephone number.

Online comments are no longer available.

Interview with Genevieve Clay-Smith, director of Boss Cat showing at the Byron Bay Film Festival

When Sonja (Olivia Hargroder) loses her mother without warning, the only steady presence left in her life is her grandmother, Doris. But Doris’s idea of stability means dismantling everything Sonja has built. For Sonja, who lives with Trisomy 21 (Down syndrome) and has spent her life fighting to be underestimated by no one, Doris’ plan feels less like protection and more like erasure. Directed by Genevieve Clay-Smith, Boss Cat is a vibrant, big-hearted Australian dramedy about independence, family and self-determination, anchored by a fearless lead performance.

Something for everyone at the Picture House

From Australian superstar musos, to brand new documentaries, to comedians at the top of their game, there really is something for everyone at the Brunswick Picture House.

Thirty-six unmissable films

The 2026 Russell Hobbs British Film Festival features an unmissable line up 36 films, including five retrospectives which will screen from 28 October to 29 November at Palace Byron Bay and Ballina Cinemas.

A timeless story of self-discovery

A husband with a promotion, two adorable children and a lovely new house. Nora thought she had it all. But did she? What was the discontent that was whispering to her in the shadows?